Case study #3 TV station

Case study #3 TV station
June 24, 2020 Ian Sterne

Faced with a significant rise in threats, this organization looked to harden key glass entranceways into their studios.

The organization explored conventional bullet proof glass and dismissed the technology due to costs, re-construction and re-engineering requirements and down-time.

Using our proprietary technology, ACE  retrofit the entranceway to a ballistic level of UL Level 1.

Total cost with ACE: $60,000
Conventional ballistic glass:  Dismissed by client due to costs and complex technical requirements
Stock image.  Image is NOT of actual client site.